South Energy believes that the Narrogin site is ideal for a BESS project for the following reasons:
- Excellent access to the grid through the adjacent Narrogin South 220kV Substation.
- The land is flat and is mostly cleared.
- It is highly accessible through transport connections to the Narrogin Valley Road and Mellons Road.
- There is enough land for future stages to serve the increasing demand for energy storage.