BESS project footprint consists of the battery storage zone, substation and control building zone, and operation and maintenance zone, which will be constructed over an area of around 5 ha. BESS components are contained in modular cells which in turn are containerized. They will be installed on concrete pads or footings that are similar to those used for substations or even residential dwellings. Underground cabling will be installed by trenching and backfilling the ground. During decommissioning, the cables will be unearthed and recycled.